久久九九电影,久久综合热,免费三级大片 Installing Grafoil Crinkle Gasket Tape

嫩草入口贡I67194成人无码观看网站I精品人妻一区二区三区浪潮在线I久久首页Iwww.com欧美I亚洲免费黄色I亚欧精品久久久久久久久久久Iwww.wuyeI91人妻系列I99久视频I超碰97免费I男人都懂的www网站免费观看I中国妞XXXI日本在线色I国产精品白嫩熟妇BBBBBBIav成人免费I99超碰在线观看I久久在线网

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installing Grafoil Crinkle Gasket Tape

1. Brush off any rust or foreign particles. Wipe flange surface thoroughly with a rag soaked in acetone or other suitable solvent to remove grease or oil.

2. Insert fingernail between the paper backing strip and the tape and strip the paper back three to six inches. Draw a reference line in flange and press squared off end of tape against it.

3. Now, start laying the tape along the face of the flange, peeling the paper backing as you go. To prevent the adhesive surfaces of the tape from doubling back on themselves and sticking together, strip away only a few inches of paper at a time.

4. When the starting point has been reached, lap the tape not more than 1/16 inch and cut with a sharp blade.

5. If wrinkles appear because of improper installation, the may be rolled out with a length of pipe.

For Multiple Thickness Gasket, Add Steps 6, 7 and 8

6. When the starting point has been reached, do not cut the tape. Roll out the tape already laid down using a short length of smooth pipe to iron out the wrinkles.

7. Now, repeat step 3. Be sure that the top layer is positioned exactly above the first layer before contact is made. Once the adhesive touches the tape, it is impossible to separate the layers without tearing them.

8. Repeat steps 6 and 7, depending on the number of layers of tape to be laid down. Finish with steps 4 and 5.

>>The End>>

浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn
主站蜘蛛池模板: 临湘市| 阿荣旗| 赤水市| 肇源县| 长沙县| 资阳市| 拜泉县| 南木林县| 千阳县| 突泉县| 徐汇区| 葫芦岛市| 合水县| 广汉市| 三亚市| 增城市| 石门县| 石林| 高州市| 浏阳市| 大宁县| 扶绥县| 论坛| 二连浩特市| 泰兴市| 郓城县| 华宁县| 三穗县| 晴隆县| 雅安市| 太康县| 黔江区| 大新县| 方城县| 买车| 德化县| 玛纳斯县| 营口市| 寿宁县| 建德市| 本溪市|